ROCKET CRYPTOASIC Mining
← Back to ASIC catalogue
Profit / Day$2.55/day
Bitmain Antminer S21 XP+ Hyd (500Th/s)

Hashrate

500Th/s

Power

5500

Efficiency

11.00 W/TH

Availability

188 in stock

Product overview

Built for reliable commercial mining

Manufacturer Bitmain Model Antminer S21 XP+ Hyd (500Th) Also known as Bitmain Antminer S21 XP+ Hydro Release Jul 2025 Size 339 x 173 x 207mm Weight 13800g Noise level 50dB Cooling Hydro cooling (OD10) Power 5500W Voltage 380-415V Interface Ethernet Temperature 20 - 50 °C Humidity 10 - 90 %

BitmainAsic MinerWarranty support

Tested & certified

Prepared and checked before delivery

Global delivery

Shipping support to more than 50 countries

Managed hosting

Power, cooling, monitoring, and operations support

24/7 assistance

Sales, delivery, hosting, and after-sales help

Profitability

Estimated operating economics

Review estimated revenue, electricity cost, net result, and payback timing alongside the machine price and power profile.

Net Profit / Day

$2.55

Last updated: Jul 26, 2026, 12:54 AM

Gross Revenue / Day

$16.03

Estimated before deductions.

Electricity / Day

$13.16

5500W at $0.0997/kWh.

Net Profit / Day

$2.55

Estimated after costs.

Pool Fee

$0.32

2%

Hosting Commission

$0

0%

Monthly Net

$76.5

30-day estimate

Yearly Net

$930.75

365-day estimate

ROI Estimate

2.3 years

Based on net/day

Mining Coin

BTC

Calculator target

Data Source

WhatToMine

Profit feed

Status

Low Profit

Profit category

Installation check

Can I run this miner?

Check the electrical, heat, noise, and uptime requirements for Bitmain Antminer S21 XP+ Hyd (500Th/s). This is a planning estimate; a qualified electrician should approve the final installation.

Assessment

Changes are recommended before installation

Hosted mining or a purpose-built mining space is the safer option for this setup.

Total load

5,500 W

Current draw

25.0 A

Recommended breaker

32 A

Monthly energy

3,960 kWh

Monthly power cost

$475.20

Heat output

18,766 BTU/h

Estimated noise

75 dB

Operating location

Not selected

What to address

  • Available 20A supply is below the recommended 32A dedicated circuit.
  • The selected cooling setup may not remove the heat produced safely.
  • Estimated noise is about 75 dB, which may exceed your selected tolerance.
  • This setup is likely unsuitable for normal living space because of heat, noise, and power demand.

PDU: 220V PDU rated above 32A

Cable: Industrial cable and protection sized for at least 32A

Cooling: Exhaust heat directly outdoors and keep intake air clean and unrestricted.

Deployment fit

Evaluate this machine against your operating target

Consider this miner if its algorithm, power draw, hashrate, and estimated payback profile match your mining plan.

Estimated daily net profit: $2.55
Power draw: 5500
Efficiency: 11.00 W/TH

Hosting

Deploy through Rocket Crypto managed hosting

Hosting is useful if you do not want to manage power, heat, noise, cooling, uptime monitoring, and physical maintenance yourself.

Managed mining environment
Power and cooling support
Better option for customers who cannot run ASIC miners at home
View hosting options

Operating assumptions

Understand the variables behind the estimate

Profit estimates help compare ASIC miners using the available machine data and market assumptions.

Coin price can rise or fall
Network difficulty can change
Actual uptime and pool performance may vary